We use cookies to offer the best possible user experience on our website. We also use third-party cookies, to deliver personalised advertisement messages. By using our website you agree, that cookies can be saved on your device. Further information on the cookies used and on how to disable them can be found here.
 
 
 
 
 

Social Housing, Göttingen (D)

Social Housing, Göttingen (D)
 
Social Housing, Göttingen (D)
 
Social Housing, Göttingen (D)
 
Social Housing, Göttingen (D)
 
Social Housing, Göttingen (D)
 
 
18 wooden modular residential units for Social Housing

In the city of Göttingen, Germany, a new building with 18 modular residential units intended for Social Housing blends harmoniously into the urban context thanks to the colour of the façades, reminiscent of the surrounding buildings created in the 1960s in yellow klinker, one of the typical colours of the last century architecture in Lower Saxony. The wooden construction technology has enabled, as required by the Customer, a significant reduction in the construction times of this building.  In addition, the modularity and the large-scale dry mounting of the ceilings & walls optimised and reduced the on-site operations. The 8.8 x 8.8 spatial module corresponds to a residential unit with a gross area of 78 square metres and a net area of 68 square metres, with three bedrooms, living room/kitchen and bathroom. To meet the local fire prevention regulatory specifications, the building has two external sets of metallic stairs. For the design, German standards were applied: F30 for fire prevention, DIN 4109 for acoustics and Enev 2014 for energy performance.

Construction time: 6 months for "turnkey" – 3 weeks for installation of the wood structure
For the implementation of the architectural concept Rubner Objektbau has collaborated with the Venetian studio SERGIO PASCOLO ARCHITECTS.

Göttingen 30.09.2016 "Open Day" - press review:
- video (German-language)
- Göttinger Tageblatt (German-language) - 01.10.2016
Technical data and information
Client: Städtische Wohnungsbau GmbH Göttingen
Cubage: 4.275 m³
Architecture: SERGIO PASCOLO ARCHITECTS, Venezia (VE)
Construction period: April 2016 - October 2016
 
Construction period: 6 Months
Please select the month for more info
2016
January
February
March
April
May
June
July
August
September
October
November
December
 
 
 
Back to list
 
 
 
 
 
 
© 2017 Rubner Objektbau GmbH | VAT No. 02223110210 | Imprint | Cookies | Sitemap | Leg. Decree 231/2001 | Privacy Go to top
 
 
Newsletter RUBNER