Some figures on our work...
with an average of 2 to 6 shipments per day, the material for our “CL1-East” work site at the 2015 Milan Expo arrives from the Rubner plant in Bressanone
- for an 11m x 11m constructed module, the transported material can be broken down as follows:
- 2 articulated lorries for the structure (beams and pillars)
- 1 articulated lorry for the walls
- 1 articulated lorry for the roof and flooring
- other equipment generally found at the work site:
- 3 to 5 rotating telehandlers
- 7 articulated platforms
- 7 scissor platforms
- 5 cranes